{"id":949,"date":"2011-09-06T13:52:09","date_gmt":"2011-09-06T20:52:09","guid":{"rendered":"http:\/\/sjcctimes.com\/?p=949"},"modified":"2012-02-10T13:53:30","modified_gmt":"2012-02-10T21:53:30","slug":"construction-on-campus-coming-close-to-an-end","status":"publish","type":"post","link":"https:\/\/sjcctimes.com\/es\/949\/campus-life\/construction-on-campus-coming-close-to-an-end\/","title":{"rendered":"Construction on campus coming close to an end"},"content":{"rendered":"<p>The art building construction has officially broken ground. The project was designed and is being built by Aedis Architecture  and Blach Construction and costs $28 million.<\/p>\n<p>&#8220;Right now, we will have range from 20 to 50 guys a day, five days a week, from 7 a.m. to 3 p.m. working on getting building concrete set up,&#8221; said a construction worker who wouldn&#8217;t give his name. <\/p>\n<p>&#8220;The mountain of dirt you can see when you pass by, that&#8217;s from the old building back in 1947, and we will be re-using the soil to build the new art building,&#8221; a construction worker said, &#8220;It represents how eco-friendly this building will be.&#8221;  <\/p>\n<p>Construction goes on with no complaints from classes held next door, so far. <\/p>\n<p>&#8220;It will just be minor construction sounds,&#8221; said Patricia Johnson, 21. &#8220;I have my Introduction to Business class before noon, but we can hardly hear the construction unless we step outside of the building.&#8221; <\/p>\n<p>According to Professor Bell, the new building will have a 3D sculpture room, all equipment needed in each room, and an open gallery for art students. <\/p>\n<p>&#8220;We are very excited about the new building and the architecture designs are amazing,&#8221; Bell said. <\/p>\n<p>&#8220;The only minor complaint we got was the temporary classroom being crowded for students during class sessions,&#8221; said Bell, &#8220;but the school has accommodated enough to provide full facility for us to use.&#8221;<\/p>\n<p>According to Aedis&#8217; website, the multidisciplinary art complex will focus on natural light, ventilation faculty and a highly efficient HVAC (heating, ventilation, air-conditioning) system. Designers are targeting a LEED certificate, which exemplifies Leadership in Energy and Environmental Design. The main purpose is to improve performance in energy savings, water efficiency, CO2 emissions reduction and indoor environmental quality. <\/p>\n<p>&#8220;The current estimate date to be finished is August 2012. However, we are hoping to finish by spring of 2012&#8221; according to the site. <\/p>","protected":false},"excerpt":{"rendered":"<p>The art building construction has officially broken ground. The project was designed and is being built by Aedis Architecture and Blach Construction and costs $28 million. &#8220;Right now, we will have range from 20 to 50 guys a day, five days a week, from 7 a.m. to 3 p.m. working on getting building concrete set&#8230;<\/p>","protected":false},"author":23,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"staff_name":[582],"class_list":["post-949","post","type-post","status-publish","format-standard","hentry","category-campus-life","staff_name-kelly-hsu"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction on campus coming close to an end - City College Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/sjcctimes.com\/es\/949\/campus-life\/construction-on-campus-coming-close-to-an-end\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction on campus coming close to an end - City College Times\" \/>\n<meta property=\"og:description\" content=\"The art building construction has officially broken ground. The project was designed and is being built by Aedis Architecture and Blach Construction and costs $28 million. &#8220;Right now, we will have range from 20 to 50 guys a day, five days a week, from 7 a.m. to 3 p.m. working on getting building concrete set...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/sjcctimes.com\/es\/949\/campus-life\/construction-on-campus-coming-close-to-an-end\/\" \/>\n<meta property=\"og:site_name\" content=\"City College Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SJCityCollegeTimes\" \/>\n<meta property=\"article:published_time\" content=\"2011-09-06T20:52:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2012-02-10T21:53:30+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@sjcctimes\" \/>\n<meta name=\"twitter:site\" content=\"@sjcctimes\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\" Kelly Hsu\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction on campus coming close to an end - City College Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/sjcctimes.com\/es\/949\/campus-life\/construction-on-campus-coming-close-to-an-end\/","og_locale":"es_ES","og_type":"article","og_title":"Construction on campus coming close to an end - City College Times","og_description":"The art building construction has officially broken ground. The project was designed and is being built by Aedis Architecture and Blach Construction and costs $28 million. &#8220;Right now, we will have range from 20 to 50 guys a day, five days a week, from 7 a.m. to 3 p.m. working on getting building concrete set...","og_url":"https:\/\/sjcctimes.com\/es\/949\/campus-life\/construction-on-campus-coming-close-to-an-end\/","og_site_name":"City College Times","article_publisher":"https:\/\/www.facebook.com\/SJCityCollegeTimes","article_published_time":"2011-09-06T20:52:09+00:00","article_modified_time":"2012-02-10T21:53:30+00:00","twitter_card":"summary_large_image","twitter_creator":"@sjcctimes","twitter_site":"@sjcctimes","twitter_misc":{"Escrito por":" Kelly Hsu","Tiempo de lectura":"2 minutos"}},"_links":{"self":[{"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/posts\/949","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/comments?post=949"}],"version-history":[{"count":1,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/posts\/949\/revisions"}],"predecessor-version":[{"id":950,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/posts\/949\/revisions\/950"}],"wp:attachment":[{"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/media?parent=949"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/categories?post=949"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/tags?post=949"},{"taxonomy":"staff_name","embeddable":true,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/staff_name?post=949"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}