{"id":17621,"date":"2024-05-20T11:55:39","date_gmt":"2024-05-20T18:55:39","guid":{"rendered":"https:\/\/sjcctimes.com\/?p=17621"},"modified":"2024-05-20T11:55:39","modified_gmt":"2024-05-20T18:55:39","slug":"new-building-coming-to-sjcc","status":"publish","type":"post","link":"https:\/\/sjcctimes.com\/es\/17621\/uncategorized\/new-building-coming-to-sjcc\/","title":{"rendered":"New Building Coming To SJCC"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Day by day, students witness an investment for the future under development as San Jose City College fills with building planners and contractors on the construction site next to the Cosmetology building. The Career Education Complex entered the scene in 2019, making it the most expensive investments for the school in its history. The companies leading the project are construction contractor Flint Builders alongside the 2023 award-winning architecture firm Steinberg Hart.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Resident voters in San Jose voiced their support to welcome Measure X, which used a facilities bond that benefits buildings located in San Jose City College and Evergreen Valley College. Furthermore, this includes a $748 million bond that allows for renovations and repairs that passed in 2016. The Citizens&#8217; Bond Oversight Committee will do all repairs and restorations to ensure all buildings meet the proper safety requirements.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Currently, builders are pounding away at the steel foundation, but the project looks far from finished and is projected to open in 2025, roughly one year behind the posted 2024 date. The purpose of this project creates space for programs such as &#8220;medical assisting, laser technology, heating ventilation, and air conditioning classes,&#8221; said Daniel Garza, Director of Marketing and Public Relations. Aside from classrooms, technical programs such as dental assistance and computer coding are skills that students will have if they want to receive a certificate to enter the workforce.<\/span><\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_17626\" aria-describedby=\"caption-attachment-17626\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-17626\" src=\"https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0218-600x450.jpg\" alt=\"\" width=\"600\" height=\"450\" srcset=\"https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0218-600x450.jpg 600w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0218-1200x900.jpg 1200w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0218-768x576.jpg 768w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0218-1536x1152.jpg 1536w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0218-300x225.jpg 300w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0218.jpg 2001w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-17626\" class=\"wp-caption-text\">Current construction of the Career Education complex building. (<a href=\"https:\/\/sjcctimes.com\/staff_profile\/angel-carrisosa-2\/\">Angel Carrisosa<\/a>)<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">While the new building benefits future students, there are side effects such as the excessive noise from the construction. Ivana Aguilera, a Computer Science major, explained, \u201cI&#8217;m in the classroom right here, like right across, and I can hear it all the way inside the classroom.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Daniel Garcia, a Dental Assisting major, feels \u201clike it would give a new experience for the newcomers who want to major in those programs.\u201d Another student, Joshua Vidal, a Mechanical Engineering student, explained, \u201cit is going to pay off in the end, all the programs are going to be there so students do not have to walk back and forth to their classes.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Students&#8217; optimistic view for the completion of the Career Education Complex creates excitement for the future. Once the building finishes, the celebration and marketing will kick off to showcase the investment. \u201cWe\u2019ll probably have a ribbon-cutting ceremony\u2026we\u2019ll have the TV news and social media marketing,\u201d said Garza.<\/span><\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_17625\" aria-describedby=\"caption-attachment-17625\" style=\"width: 600px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-17625 size-medium\" src=\"https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0183-600x338.jpg\" alt=\"\" width=\"600\" height=\"338\" srcset=\"https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0183-600x338.jpg 600w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0183-1200x676.jpg 1200w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0183-768x433.jpg 768w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0183-1536x865.jpg 1536w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0183-300x169.jpg 300w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0183.jpg 2001w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-17625\" class=\"wp-caption-text\">Interior rendering of the Career Education building. (Steinberg Hart)<\/figcaption><\/figure>\n<figure id=\"attachment_17624\" aria-describedby=\"caption-attachment-17624\" style=\"width: 600px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-17624\" src=\"https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0181-600x338.jpg\" alt=\"\" width=\"600\" height=\"338\" srcset=\"https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0181-600x338.jpg 600w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0181-1200x676.jpg 1200w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0181-768x433.jpg 768w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0181-1536x865.jpg 1536w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0181-300x169.jpg 300w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0181.jpg 2001w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-17624\" class=\"wp-caption-text\">Career Education Complex rendering (Steinberg Hart)<\/figcaption><\/figure>\n<figure id=\"attachment_17623\" aria-describedby=\"caption-attachment-17623\" style=\"width: 600px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-17623 size-medium\" src=\"https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0182-1-600x338.jpg\" alt=\"\" width=\"600\" height=\"338\" srcset=\"https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0182-1-600x338.jpg 600w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0182-1-1200x675.jpg 1200w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0182-1-768x432.jpg 768w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0182-1-1536x864.jpg 1536w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0182-1-300x169.jpg 300w, https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0182-1.jpg 2001w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-17623\" class=\"wp-caption-text\">Side profile rendering of the Career Education building. (Steinberg Hart)<\/figcaption><\/figure>\n<p><br style=\"font-weight: 400;\" \/><br style=\"font-weight: 400;\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>Day by day, students witness an investment for the future under development as San Jose City College fills with building planners and contractors on the construction site next to the Cosmetology building. The Career Education Complex entered the scene in 2019, making it the most expensive investments for the school in its history. The companies&#8230;<\/p>","protected":false},"author":88943,"featured_media":17624,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[378],"tags":[],"staff_name":[1637],"class_list":["post-17621","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","staff_name-angel-carrisosa"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New Building Coming To SJCC - City College Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/sjcctimes.com\/es\/17621\/uncategorized\/new-building-coming-to-sjcc\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New Building Coming To SJCC - City College Times\" \/>\n<meta property=\"og:description\" content=\"Day by day, students witness an investment for the future under development as San Jose City College fills with building planners and contractors on the construction site next to the Cosmetology building. The Career Education Complex entered the scene in 2019, making it the most expensive investments for the school in its history. The companies...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/sjcctimes.com\/es\/17621\/uncategorized\/new-building-coming-to-sjcc\/\" \/>\n<meta property=\"og:site_name\" content=\"City College Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SJCityCollegeTimes\" \/>\n<meta property=\"article:published_time\" content=\"2024-05-20T18:55:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0181.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2001\" \/>\n\t<meta property=\"og:image:height\" content=\"1127\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@sjcctimes\" \/>\n<meta name=\"twitter:site\" content=\"@sjcctimes\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\" Angel Carrisosa, City Times Staff\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutos\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New Building Coming To SJCC - City College Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/sjcctimes.com\/es\/17621\/uncategorized\/new-building-coming-to-sjcc\/","og_locale":"es_ES","og_type":"article","og_title":"New Building Coming To SJCC - City College Times","og_description":"Day by day, students witness an investment for the future under development as San Jose City College fills with building planners and contractors on the construction site next to the Cosmetology building. The Career Education Complex entered the scene in 2019, making it the most expensive investments for the school in its history. The companies...","og_url":"https:\/\/sjcctimes.com\/es\/17621\/uncategorized\/new-building-coming-to-sjcc\/","og_site_name":"City College Times","article_publisher":"https:\/\/www.facebook.com\/SJCityCollegeTimes","article_published_time":"2024-05-20T18:55:39+00:00","og_image":[{"width":2001,"height":1127,"url":"https:\/\/sjcctimes.com\/wp-content\/uploads\/2024\/05\/IMG_0181.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_creator":"@sjcctimes","twitter_site":"@sjcctimes","twitter_misc":{"Escrito por":" Angel Carrisosa, City Times Staff","Tiempo de lectura":"3 minutos"}},"_links":{"self":[{"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/posts\/17621","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/users\/88943"}],"replies":[{"embeddable":true,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/comments?post=17621"}],"version-history":[{"count":5,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/posts\/17621\/revisions"}],"predecessor-version":[{"id":17631,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/posts\/17621\/revisions\/17631"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/media\/17624"}],"wp:attachment":[{"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/media?parent=17621"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/categories?post=17621"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/tags?post=17621"},{"taxonomy":"staff_name","embeddable":true,"href":"https:\/\/sjcctimes.com\/es\/wp-json\/wp\/v2\/staff_name?post=17621"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}